•  

    MEP Plant

     

    Our client was tasked to design a new electrical transformer and electrical duct line run within the existing as-built conditions. Client requested a geo-referenced 3D PointCloud deliverable to use for design and clash detection for their new design.

     

     

    POINTCLOUD
     
     
    POINTCLOUD
     
     
    POINTCLOUD
     
     
    POINTCLOUD