![thumbnail image](https://custom-images.strikinglycdn.com/res/hrscywv4p/image/upload/c_limit,fl_lossy,h_630,w_1200,f_auto,q_auto/10547155/342472_298115.png)
MEP Plant
Our client was tasked to design a new electrical transformer and electrical duct line run within the existing as-built conditions. Client requested a geo-referenced 3D PointCloud deliverable to use for design and clash detection for their new design.
POINTCLOUD
POINTCLOUD
POINTCLOUD
POINTCLOUD